Why Do Floor Plenums Fail Air Testing?


There are many reasons why 70-75% of floor plenums fail their first air tightness test at the first attempt. One of the most common reasons is due to a lack of understanding within the construction industry as to how airtight a plenum needs to be. One common problem is that many plenums are built and tested under laboratory conditions; unfortunately there is a big gap between what happens in a lab to the reality of plenums construction on a building site. With multiple contractors needing to put pipes, cables etc. through the plenum, this is just one of many things that can affect the air tightness of a floor plenum



Many contractors often worry about the air tightness of the raised access floor (which is important) but fail to realise the importance of the rest of the plenum envelope, i.e. the walls and floors. Unfortunately, in our experience its leaky walls and floors that usually contribute to floor plenum failures. 

Floor plenum testing procedure BG65 / 2016, offers helpful advice on what areas to seal in new and existing floor plenums. 

APT Sound Testing undertakes all types of Floor Plenum Testing to BG65 / 2016. Using the latest equipment we can test the largest floor plenums with floor areas in excess of 1000m2 and have undertaken hundreds of floor plenum tests throughout the London and the South East.   

If you would like more information on our floor plenum testing please contact us at: info@aptsoundtesting.co.uk or visit our Floor Plenum Testing page on our website. Alternatively for more information on our oother services, please visit our website at www.aptsoundtesting.co.uk 


Comments

Popular posts from this blog

Constructing Floor Plenums to Pass Air Tightness Testing

The Most Common Air Leakage Paths in Floor Plenums

The main terms used in the construction of floor plenums